Andrews dry concrete flooring at tarmac company warehouse
Before concrete can be laid during the winter period, a series of precautions must be taken to ensure the composition sets correctly. When outdoor temperatures are low, concrete naturally sets
Andrews Heat for Hire aid construction of new London school
Low ambient temperatures during the finishing stages of a building can cause problems for a contractor, while frost can damage delicate materials and a slow drying process may delay an
International steel manufacturer saved six-figure sum
Andrews Dehumidification has helped one of Europe’s largest steel producers save a staggering £120,000 this winter, after providing them with a tailor-made drying arrangement. The steelworks had previously sought assistance